![]() “The 2012 Ontario Building Code applies for all permit applications filed after December 31, 2013,” explains Seiling of the revised OBC, which will increase Ontario’s consistency with other codes across the country, enabling businesses to better sell their products and services nationwide. As well, builders should be prepared for certain changes related to onsite sewage systems, which take effect on December 31, 2016.Īccording to the Ministry, this phase-in period gives the industry adequate time to learn about the new changes and prepare for their implementation. Some energy efficiency provisions will come into effect January 1, 2015, with additional adjustments scheduled for January 1, 2017. 332/12 in November 2012, the Ministry of Municipal Affairs and Housing formed the new Ontario Building Code 2012, which came into force January 1, 2014. ![]() However, there are only some 500 technical changes,” notes Mike Seiling, president of the Ontario Building Officials Association (OBOA).Īlthough it’s still a daunting number, all the changes are not hitting builders at once. “Yes, the new code has some 20,000 changes from the 2006 version. While the Ontario Building Code is a constantly moving target, the latest adjustments require builders to be detail oriented to stay on top of things.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |